Close Menu
Get Parts Quote
Name
Company *
WhatsApp / WeChat (For Faster Quote) *
Email *
Address
City
State / Province / Region
Zipcode
Country
Quantity *
Part Number *
Manufacturer
Preferred Condition
Additional Information
Cancel
In Stock
Fast Shipping Available
Invensys 4200N
Invensys 4200N
Invensys 4200N
Invensys 4200N
Invensys 4200N
Invensys 4200N
· Product image is representative; revision or series may vary. Contact us to request a specific version.
Ships by Wednesday, September 16

4200N

Nuclear primary extender module

Shipping Information

  • For inventory products, we support same day shipping upon payment.
  • For urgent needs, we offer same-day shipping on most items for orders placed before 2:00 PM UTC+8 Simply mention your preferred next-day shipping when place the order, and your order will be prioritized to minimize downtime.
  • For indent items, typical turnaround is 1-3 weeks, depending on parts availability and scarcity.
Customs & Documentation
We prepare clear, order-specific documentation for every international shipment, including the commercial invoice, packing list and available product or compliance documents. Before dispatch, our logistics team confirms the consignee details, declared value, shipping terms and destination requirements with you. Tracking information is provided after shipment, helping your team prepare for import clearance with confidence.
Documents checked before dispatch · Shipment details confirmed · Global tracking provided
Payment
Payment is by bank wire only in RMB/CNY, GBP, EUR or USD. Amikon does not accept credit cards or provide credit terms. Cleared payment is required before shipment unless the written quotation expressly states otherwise.
Product Condition
Factory New These are new and current items that are procured directly from the manufacturer.
New In Sealed Package Parts are new. They have not been used and still have their original package seal intact.
New in Original Package These parts are new. The packages were not originally sealed by their original manufacturer.
Quantity
Mobile *
Country/Region *
E-mail *
Company
Content *
(gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Amikong please read our privacy policy.
  • 20+

    years in automation
  • ISO 9001

    certified quality system
  • 12 months

    amikon warranty
  • 2-hour reply

    from your account manager
  • Success Story

    solutions in action
PRODUCT DESCRIPTION

4200N Nuclear primary extender module for the Tricon safety instrumented system

Triconex 4200N is a Nuclear primary extender module used with the Tricon safety instrumented system. The complete order reference identifies the required hardware and must be matched to the installed chassis, baseplate, cable or field termination.

Manufacturer documentation lists the applicable electrical, signal and installation characteristics. Verify the nameplate, hardware revision, connector layout and project records before replacement.
ACTUAL APPLICATIONS

4200N — Primary fibre distribution

Use 4200N specifically for primary fibre distribution after confirming its documented companion hardware, circuit assignments and site test plan.
  • 01 · FEED UP TO THREE REMOTE SITES

    Feed up to three remote sites

    Assign the RX1, RX2 and RX3 paths to the documented expansion locations.
  • 02 · GROUND-LOOP ISOLATION

    Ground-loop isolation

    Use the optical connection to separate remote cabinet grounds from the main chassis.
  • 03 · NETWORK PATH DIAGNOSTICS

    Network path diagnostics

    Inspect PASS, FAULT and transmit indicators for every active fibre route.

Technical specifications for 4200N

  • Product Model
    4200N
  • Product Parameters
    Nuclear primary extender module
  • Place of shipment
    Xiamen, China
  • In stock
    1 unit
  • Manufacturer
    Invensys
  • Component Type
    Nuclear primary extender module
  • Order Reference
    4200N
  • System Platform
    Triconex safety control system
  • Primary Function
    Transmits I/O bus to remote chassis
  • Channel or Port Capacity
    Up to three remote sites
  • Electrical Classification
    Multimode fibre up to 2 km
  • Compatible Hardware
    4201N remote RXM sets
  • Mounting Arrangement
    Primary Tricon chassis
  • Connection Interface
    Six fibres per remote location
  • Diagnostic Coverage
    PASS-FAULT-ACTIVE-TX-RX1-RX2-RX3
  • Documented Variant
    Nuclear 1E primary module
  • Operating Environment
    0 to 60 °C controller service
  • Storage Environment
    −40 to 75 °C equipment storage
  • Relative Humidity
    5 to 95% non-condensing
  • Commissioning Requirement
    Verify every affected safety path
View all additional

Alternative Names

4200N Triconex 4200N Invensys 4200N
SYSTEM & REPLACEMENT CHECK

Information needed before ordering

Three direct checks to secure your system integration and minimize ordering risks.

Information

System integration Replacement check Manuals & support
SYSTEM CONFIGURATION

Match 4200N to the installed Triconex configuration

Triconex 4200N is a Nuclear primary extender module for the Tricon safety instrumented system. Verify the complete product identity and controller generation before integration.
Match all mating modules, baseplates, termination panels, cables, field power and signal assignments. Preserve approved project records.
Complete the manufacturer-recommended diagnostics and site functional test after installation.

Features:

  • Exact product identity: 4200N
  • Product class: Nuclear primary extender module
  • Model-specific values listed in the specifications
The Triconex 4200N requires its ratings, wiring and installed configuration to be checked before system integration and commissioning.
INTERCHANGEABILITY

Verify the full replacement identity before commissioning

Replace Triconex 4200N only after matching the complete order reference, hardware revision, connector or terminal arrangement and installed function.
Record the existing slot, cable and field-terminal labels before removal. Transfer only configuration data approved for the exact hardware and project.
After installation, verify power, communications, every connected point, alarm response and the complete safety function.

Features:

  • Match the complete 4200N identifier
  • Compare revision, connectors and mating hardware
  • Test diagnostics and field operation before service
The Triconex 4200N requires replacement verification against the installed hardware and project documentation.
DOCUMENTATION STATUS

Browse the Manuals, Datasheets, Official Documents, Links

Important Notice: Available documents must be matched to the complete 4200N identity, installed system and applicable revision.

Features:

  • Model-specific data sheet prepared for 4200N
  • Manufacturer guide reference identified before order
  • Installation steps follow Triconex maintenance controls
Documentation for Triconex 4200N must match the installed system and revision; confirm manual availability in the written quotation.

Important notice

Manuals, software, firmware, cables, calibration data and accessories are included only when listed in the quotation. AMIKON is an independent supplier and is not affiliated with or authorised by the manufacturer.
This content has been produced using multiple sources. Takes no responsibility for the accuracy of this information. Always consult the original equipment manufacturer for the most up to date instructions and information.
BUYER INFORMATION

Commercial terms without hidden steps

Your written quote confirms the product identity, price, availability, lead time, warranty and shipping terms before payment.
  • 01

    Shipping & delivery

    Dispatch
    Eligible stock: same / next day
    Carriers
    DHL, FedEx or UPS
    Ship from
    Xiamen, China
    Packed size
    2.2 × 40.5 × 40 cm
    Shipping weight
    1.88 kg
  • 02

    Payment & customs

    Payment
    Bank transfer (T/T)
    Currencies
    USD · EUR · GBP · RMB
    Credit cards
    Not accepted
    HS reference
    8538900000
    Origin
    United States
  • 03

    Warranty & returns

    Warranty
    12 months from AMIKON
    Inspection
    Label, condition and packing checks
    Returns
    Prior RMA authorisation required
    Compatibility
    Confirm before order
    OEM warranty
    Does not apply
Your written quote confirms the product identity, price, availability, lead time, warranty and shipping terms before payment.
  • Part checked

    Full suffix recorded
  • Condition checked

    Label and appearance
  • Packing checked

    Antistatic protection
  • Tracking supplied

    Established couriers
  • Sandy Lin

    Dedicated account manager · 15+ years
FREQUENTLY ASKED QUESTIONS

Questions buyers ask about 4200N

Direct answers about identity, compatibility, stock, warranty, payment and shipping.
  • Which installed record confirms primary function for this primary fibre distribution?

    Primary Function is Transmits I/O bus to remote chassis. Compare the approved drawing and complete nameplate.
  • How should technicians verify channel or port capacity during primary fibre distribution?

    Channel or Port Capacity is Up to three remote sites. Record the measured result in the maintenance file.
  • What must be matched before using 4201N remote RXM sets with this primary fibre distribution?

    Compatible Hardware is 4201N remote RXM sets. Confirm mating hardware before any connector is engaged.
  • Why does connection interface matter to the primary fibre distribution connection?

    Connection Interface is Six fibres per remote location. Preserve labels, polarity and physical keying.
  • Which diagnostic result is required for primary fibre distribution acceptance?

    Diagnostic Coverage is PASS-FAULT-ACTIVE-TX-RX1-RX2-RX3. Resolve every active fault indication before release.
  • How is the documented variant distinguished during primary fibre distribution replacement?

    Documented Variant is Nuclear 1E primary module. Do not infer interchangeability from appearance alone.
  • What environmental limit applies while commissioning the primary fibre distribution?

    Operating Environment is 0 to 60 °C controller service. Keep the cabinet within the documented operating limits.
  • Which final test releases the primary fibre distribution hardware to service?

    Commissioning Requirement is Verify every affected safety path. Test every affected signal path under the site procedure.
READY TO VERIFY YOUR PART?

Get a 4200N quote with price, lead time and revision check.

Trusted by 5,000+ plants worldwide | Backed by our vast inventory of top-tier control parts, drives and servo motors, fast shipments are dispatched to cover your urgent needs. ABOUT US >>
Disclaimer: Amikon Limited sells new and surplus products and develops channels for purchasing such products. Amikon Limited is not an authorized surplus dealer or affiliate for the Manufacturer of this product. The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. Because Amikon Limited is not an authorized distributor of this product, the Original Manufacturer's warranty does not apply. Amikon Limited is not an authorized distributor, dealer, or representative of the products displayed on this website. All product names, trademarks, brands, and logos used on this website are the property of their respective owners. The description, explanation, or sale of products with these names, trademarks, brands, and logos is for identification purposes only and is not intended to indicate any association with or authorization from any rights holder.
Product

Product Browsing History