Bently Nevada 3500 Old vs. New Versions: What Changes Before a Replacement Is Approved?

About the Reviewer
Sandy Lin
Sandy Lin's linkedin:

Sandy Lin - Amikon Gorden Partner
With 15+ year experience in automation parts supply, Sandy has served over 8,000 clients, achieving an 85% satisfaction rate. The supplied products are applied in government departments, involving various fields such as petrochemicals, metallurgy, steel, wind power, hydropower, aviation, packaging and transportation, etc. Her professional services and rapid response have earned it a highly praised reputation in the automation industry.She can perceive market changes, provide timely solutions to customers, and achieve sustainable long-term cooperation.

Comparing Bently Nevada 3500 old and new versions requires more than matching a series name. OEM-documented changes may combine rack functions, add data-collection capability, consolidate power-input options, define new application-specific functions, or move the installation to another platform. This guide shows procurement and engineering teams how to identify what actually changed, what operating need the change addresses, and what evidence is required before the candidate is approved. Module-level terminal and wiring details remain separate engineering tasks.

What Changed in Documented 3500 Upgrade Paths?

In the Bently Nevada 3500 installed base, "old versus new" can describe three different levels of change: an OEM upgrade within the 3500 architecture, a redesigned component family, or a migration to another platform. The correct question is not whether the candidate looks newer. It is what function changed, what operating or lifecycle need the change addresses, and what else in the rack, field wiring, software, or approval basis must change with it.

Documented Change Path What the OEM Changed Capability or Need Addressed Replacement Consequence
3500/20 RIM to 3500/22M TDI The TDI combines the RIM rack-interface function with communication-processor data collection. Static data is standard; an optional enabling disk supports dynamic and high-resolution transient data. Integrates rack communication and condition-monitoring data collection, with Ethernet transfer to compatible configuration and System 1 software. Replace the RIM I/O with the selected TDI I/O; verify every M-series module, network medium, software baseline, license or enabling requirement, and the OEM change sequence.
Legacy 3500/15 AC to Universal AC Separate high- and low-voltage AC options were consolidated into one Universal AC supply/PIM family. The documented input range is 85 to 264 Vac rms in non-hazardous locations and 85 to 250 Vac rms in hazardous locations. The PIM also gained a pluggable power connector and a redesigned fuse arrangement. Reduces AC option complexity while preserving a lower upper-voltage limit in hazardous locations. The applicable range still depends on the complete ordering information, installation classification, and approval documents. Replace the front supply and rear PIM as a matched Universal AC pair. Do not mix either current part with legacy AC hardware.
Earlier or non-M monitor to an M-series monitor Current M-series documents define application-specific measurement functions and the firmware/software baselines needed for them. Examples include REBAM requirements on the 3500/40M and feature-specific requirements on the 3500/42M. Defines the measurement and processing capability that must be matched to the installed monitoring duty; it does not create one universal M-version upgrade rule. Identify the exact predecessor, rear I/O, transducers, channel functions, firmware, software, alarms, approvals, and configuration before classifying the change.
3500 system to Orbit 60 OEM retrofit guidance treats this as a system project, with separate objectives for modernization, functionality upgrade, capacity addition, or controls upgrade. Addresses lifecycle, capability, expansion, or broader controls-project requirements at system level. Reassess chassis, power, relays, recorder outputs, field wiring, transducers, hazardous-area scope, communications, configuration, and commissioning. Do not classify it as a card swap.

These paths show why "new" is not one technical category. The 3500/22M TDI is an architecture and data-collection upgrade; Universal AC is a power-family redesign and consolidation; M-series evaluation is module- and function-specific; Orbit 60 is a system retrofit. A buyer should name the documented change path first, then evaluate the exact installed and candidate assemblies against the applicable OEM revision and site evidence.

Primary OEM evidence used for this distinction: 3500/22M document 161581 Rev. AC; 3500/15 AC Power Supply Product Update PUN-153020237 Rev. NC; 3500/40M document 141535 Rev. R; 3500/42M document 143694 Rev. AE; and Orbit 60 retrofit document 154M8092 Rev. F. Retain a controlled copy of PUN-153020237 Rev. NC in the project evidence package when no public OEM copy is available. Use the revision approved for the project rather than assuming that the latest available file governs an older installation.

For each installed unit and candidate, photograph the complete front label, the rear I/O or PIM, revision or date markings visible without unsafe disassembly, connectors, rack position, and the full front and rear rack context. Preserve original files, capture date, asset tag, configuration backup, and source document. Mark unreadable or unavailable fields as Unknown.

Which Differences Between Older and Newer 3500 Versions Actually Matter?

An OEM-documented difference matters when it changes an interface, supported function, data path, maintenance method, or approval basis. The comparison below turns broad version language into decisions owned by procurement, controls, reliability, electrical, and functional-safety teams. A visual difference that is not linked to controlled OEM evidence is not a replacement conclusion.

Difference to Check Evidence to Compare Possible Effect Approval Treatment
Documented upgrade path OEM product update, upgrade instruction, supersession record, or retrofit methodology Architecture, capability, serviceability, lifecycle, or the surrounding replacement scope Classify the change path before comparing the candidate as a spare
RoHS or material compliance Exact compliance marking, applicable declaration, project specification Procurement and regulatory acceptance Confirm only when the exact assembly and market requirement are documented
Components and circuit board revision Label revision, OEM service bulletin, controlled drawing where available Input behavior, reliability, calibration, or service method Engineering Confirmation Required unless the OEM defines interchangeability
Measurement and data collection Channel type, static values, waveform capability, sampling requirement Protection configuration and condition monitoring Match the actual machine-monitoring duty, not a feature list
System 1 connection TDI or RIM architecture, protocol, software release, license or enabling requirements Data collection, historian connection, diagnostics Controls and condition-monitoring owners must verify the complete chain
USB, Ethernet, or other communication Front and rear interfaces, cable type, network medium, protocol, addressing Configuration access and plant communication Confirm ports, rear I/O, cables, network design, and cybersecurity controls
Firmware Installed and candidate versions, OEM minimums, known upgrade path Feature support, rack communication, configuration acceptance Do not assume later firmware is acceptable in an older rack
Rack Configuration Software Version used to save, open, edit, and download the rack file Configuration transfer and change control Test the backup and candidate in a controlled environment before outage work
Certifications and approval options Complete ordering suffix, certificate, SIL lifecycle record, hazardous-area drawing Legal, project, and functional-safety acceptance Treat a changed approval option as an engineering decision, not a purchasing substitution

OEM data shows why these categories cannot be collapsed. The 3500/22M TDI datasheet, document 161581 Rev. AC, describes USB-B on the front and copper or fiber Ethernet through the selected rear I/O. It also connects the rack to compatible 3500 configuration and System 1 software. These facts define interfaces, but they do not prove that any software release, license, cable, network, or earlier module revision is acceptable.

The 3500/40M and 3500/42M documents show why the M suffix cannot be treated as one universal upgrade claim. REBAM on the 3500/40M requires specified module firmware and software revisions. The 3500/42M ties Shaft Absolute, REBAM, Acceleration II, Velocity II, and Circular Acceptance Region functions to specific firmware and software baselines. These are application-specific capability paths, not evidence that any M module will replace any non-M module.

1. Capture the Installed Assembly 2. Verify the OEM Change 3. Assess the Application Impact 4. Classify the Replacement
Front module, rear I/O or PIM, rack role, firmware, configuration, field function OEM datasheet, upgrade notice, compatibility warning, document number and revision Monitoring duty, data path, wiring, software, approvals, outage and test scope Direct, Conditional, or Engineered / Not Directly Compatible, with owner and open questions

Read left to right. If an upstream identity, OEM source, or application-impact field remains Unknown, do not advance the result to Direct Replacement.

Can a Newer 3500 Module Directly Replace an Older Version?

Sometimes, but only after the exact installed and candidate records pass a documented comparison. The three outcomes below are procurement workflow categories, not OEM product classifications. Their purpose is to prevent an uncertain change from being described as a direct replacement.

Decision Result Minimum Evidence What May Change Purchase Status
Direct Replacement Exact front and rear identities match the approved requirement; hardware and firmware revisions are accepted; the existing configuration and application remain valid No planned functional, I/O, communication, wiring, or approval change Procurement may proceed after engineering signs the comparison and test plan
Conditional Replacement The function can be preserved, but documented changes are required I/O, PIM, cable, termination hardware, firmware, configuration software, companion module, network setting, or certification record Quote the complete change scope; approve only after every condition has an owner and closure evidence
Engineered or Not Directly Compatible Function, input, output, backplane relationship, communication architecture, power arrangement, protection logic, or approval basis differs materially Redesign, additional hardware, rewritten configuration, new testing, or platform migration Do not buy as a drop-in spare; open a managed engineering change or reject the candidate

Even the Direct Replacement result is conditional on evidence. It does not mean "the label is close enough." The team must record the complete ordering number, suffixes, hardware revision, firmware, paired I/O or PIM, configuration checksum or controlled file, connected application, and approval basis. The receiving and post-installation tests must also match the approved record.

A Conditional Replacement should identify costs that are easy to omit from a unit-price comparison. These can include rear I/O, external termination blocks, cables, software access, firmware control, engineering time, outage duration, DCS changes, System 1 work, functional tests, and recovery hardware. If those items are not defined, the purchase is not ready for approval.

How Do the Most Common 3500 Replacement Scenarios Differ?

Each scenario has a different failure mode. The table gives the correct verification path without turning a system-level article into a terminal-by-terminal wiring guide.

Scenario Verified Starting Point Main Risk Required Verification Path Initial Classification
3500/20 RIM to 3500/22M TDI The TDI combines the RIM function with data-collection capability Old RIM I/O, rack-module compatibility, network and software scope Inventory all rack modules; identify front and rear RIM hardware; compare TDI I/O and network medium; verify software and dynamic-data requirements; follow the OEM change sequence Conditional or Engineered
3500/22M 138607-01 to 3500/22M 288055-01 The current TDI datasheet lists 288055-01 as the standard TDI spare; it does not list 138607-01 Same model name may conceal a legacy assembly, different revision, or supersession condition Preserve both labels; obtain the OEM legacy record or formal supersession evidence for 138607-01; compare rear I/O, firmware, rack population, software, and approvals Open Question until legacy evidence is found
Non-M monitor to M monitor Current documents define feature-specific firmware and software requirements for M modules Assuming the letter M proves backward compatibility Identify the exact non-M assembly, measured function, transducer, I/O, configuration, alarm setpoints, firmware, and software; compare them with the exact M manual Conditional or Engineered
3500/40 or 3500/40M to 3500/42 or 3500/42M The current 3500/40M is a Proximitor monitor; the current 3500/42M supports Proximitor and seismic inputs Similar monitoring functions do not make the I/O, transducer duty, firmware, or configuration identical Map every channel's measurement and transducer; compare I/O type, termination, barriers, firmware, static values, alarms, and software; verify the full candidate identity Conditional or Engineered
3500/42M 176449-02 for an earlier 3500/42-family unit The current 3500/42M document lists 176449-02 as the Proximitor Seismic Monitor spare Series shorthand omits I/O option, channel duty, firmware, and approval evidence Match the installed front and rear numbers, four channel assignments, transducers, termination, barriers, firmware, software, and approval suffix Direct only if the complete approved record matches; otherwise Conditional
125712-01 to a current 3500/32M 125712-01 appears in the supplied or catalog record, while current Rev. W 3500/32M documentation lists 149986-02 as the spare control module and does not establish a supersession path from 125712-01 Assigning 125712-01 to a 3500/32 or 3500/32M generation without controlled legacy evidence can invalidate the relay and rack comparison Obtain the applicable legacy OEM manual or formal supersession record; then record the rear output module, relay contact duty, alarm-drive logic, TDI or RIM, displays, configuration software, and approval status Open Question until the part-number identity and change path are documented
3500/32-family relay to 3500/33 149986-01 The current system document describes 3500/32M as four DPDT relay channels and 3500/33 as sixteen SPDT channels; the 3500/33 datasheet lists 149986-01 as the control module spare Different relay count, contact arrangement, logic mapping, voltage limits, and approvals Rebuild the cause-and-effect and terminal mapping; confirm load duty, fail-safe mode, voting, voltage, safety requirements, and DCS interface Engineered, not a direct card replacement
Legacy 3500/15 supply or PIM to a current supply or PIM OEM documentation explicitly separates legacy and current AC and DC families Mismatching the front supply and rear PIM can create an incompatible power assembly Record supply and PIM numbers together; compare AC or DC family, voltage range, primary or backup role, connector, fuse, and rack power design Conditional or Not Directly Compatible
Same series name, different complete order number The family name may match while the I/O, hardware, firmware, approval option, or supported function differs Treating a shared series name as interchangeability evidence Compare complete front and rear identities, revision, firmware, configuration, interfaces, approvals, and formal OEM supersession evidence Open Question until controlled evidence closes it

Evidence note for 125712-01: do not assign this number to a 3500/32 or 3500/32M generation from a seller listing or series shorthand. Current document 141533 Rev. W identifies 149986-02 as the 3500/32M spare control module. Keep the proposed change as an Open Question until a controlled legacy OEM record connects 125712-01 to the exact module family, rear output module, and supersession path.

The RIM-to-TDI case needs special caution. Page 8 of document 161581 Rev. AC warns that some 3500 M modules may not be compatible during a 3500/20-to-3500/22 upgrade. It also states that leaving the RIM I/O in the rack when installing the TDI will damage the TDI, and gives the sequence: remove the RIM, remove the RIM I/O, insert the TDI I/O, then insert the TDI. This is not a procurement-only decision; qualified personnel must plan and execute it under the applicable OEM and site procedures.

The power scenario is equally specific. The 3500/15 power datasheet, document 141530 Rev. P, states that the universal AC supply and PIM are not compatible with legacy AC units. It also states that the current high- and low-voltage DC supplies and PIMs are not compatible with their legacy counterparts. A new-looking supply must therefore be approved as a front-and-rear power assembly.

Why Does the Complete Part Number Matter More Than the Series Name?

The series name identifies a family, not the installed configuration. A shorthand such as 3500/42M can omit the I/O option, termination method, barrier arrangement, approval choice, hardware state, and firmware that control the replacement decision.

Record these fields for both the installed unit and the candidate:

  • Complete front-module part or ordering number, including every suffix and separator.
  • Complete rear I/O or output-module part number.
  • Power input module type when the item is a power supply.
  • Internal or external termination and all external blocks or cables.
  • Internal-barrier option and the applicable hazardous-area drawing.
  • Hardware revision, board assembly revision, and date code when present.
  • Firmware revision and required Rack Configuration Software version.
  • Agency, SIL, marine, and project-specific approval suffixes.
  • Repair, remanufacture, storage, and modification records when available.

Use a two-column record, not an email sentence such as "replace an old 3500/42 with a new 3500/42M." A completed identity record may look like this:

Controlled Field Installed Unit Candidate Unit Decision Note
Front label 3500/22M 138607-01 3500/22M 288055-01 Same family text; current OEM document supports only the candidate spare identity in this comparison
Rear I/O Exact number and network type required Exact number and network type required Must agree with the communication design; do not infer from the front label
Hardware and date markings Photograph and transcribe Photograph and transcribe Difference requires OEM or engineering disposition
Firmware and software Record installed versions and backup method Record candidate firmware and supported tools Pass only after the configuration and communication path are verified
Rack context 3500/20 RIM or 3500/22M TDI, rack and backplane evidence Candidate requirements Check the entire rack population for an RIM-to-TDI change
Approval status Certificate and project requirement Exact candidate suffix and evidence Equivalent function does not replace an approval requirement
Final status Existing baseline Offered item Pass, Fail, or Open Question; no blank cells

This sample deliberately does not declare 138607-01 and 288055-01 interchangeable. One number appears in the client's catalog and supplied list; the current OEM datasheet identifies the other as a standard TDI spare. A legacy manual, OEM supersession record, or controlled project document is still needed to connect them.

What Must Be Checked Before the Replacement Is Approved?

Approval requires one traceable comparison that engineering and procurement can both read. Each row needs evidence, an owner, a result, and a named Open Question when the evidence is incomplete.

Approval Check Required Evidence Typical Owner Pass or Fail Rule Open Question Example
Installed identity Front and rear labels, full order numbers, hardware markings Maintenance Pass when every field is readable and tied to one rack position Which rear I/O belongs to this front module?
Candidate identity and condition Candidate labels, condition statement, photos, traceable quotation Procurement Pass when the offered unit matches the approved identity and commercial requirement Is the photographed unit the unit that will ship?
Main module and I/O assembly Applicable OEM manual and installed pair Controls engineering Pass when the front and rear roles and exact options are permitted Does a changed termination option require blocks or cables?
Rack and backplane context Rack model, mounting, slot map, backplane or chassis revision where documented Reliability or controls engineering Pass when the candidate is accepted for that rack context Does the revision change require an OEM advisory?
RIM or TDI architecture Module and I/O identities, rack inventory, network and software records Controls or condition monitoring Pass when all rack modules and communication requirements are cleared Are any M modules affected by the RIM-to-TDI advisory?
Rack Configuration backup Readable controlled backup, software version, checksum or repository record Controls engineering Pass when the file can be opened and a recovery copy is secured Which software version created the active file?
Sensors, ranges, and signals Channel list, transducer identity, scale factor, range, gap or bias basis, units Instrumentation or reliability Pass when each channel's configured function matches the installed measurement Has any field transducer been changed without drawing updates?
Alarms and relays Setpoints, delays, voting, Alarm Drive Logic, cause-and-effect, DCS or trip interface Protection or controls engineering Pass after logic comparison and approved test coverage Which relay contacts participate in shutdown?
System 1 and DCS Protocol, ports, addresses, data points, licenses, server or gateway version OT or condition monitoring Pass when communication and required data are demonstrated Is dynamic waveform collection required or only static data?
SIL, hazardous-area, and project approvals Certificates, safety requirement specification, proof-test record, installation drawing Functional safety or project authority Pass only within documented certificate and project scope Does the candidate suffix preserve the installed approval?
Change and rollback plan Approved method, outage window, bypass permit, known-good spare or restoration path Site change owner Pass when responsibilities, stop criteria, and recovery steps are signed What restores protection if configuration download fails?

No single stakeholder should silently close another team's field. Procurement can confirm the offered identity, condition, quantity, delivery, and warranty scope. It cannot approve alarm logic or intrinsic safety. Controls engineers can approve configuration and communication, but they still need site evidence that the candidate shipped matches the evaluated unit.

The current 3500/32M relay datasheet, document 141533 Rev. W, page 5, illustrates this dependency: it lists TDI and software requirements that are part of the relay replacement context. The 3500/33 relay datasheet, document 162301 Rev. AC, pages 6 and 7, identifies output variants and approval-related limits. A relay's front label alone cannot close the approval.

For broader lifecycle decisions, use our 3500 upgrade planning guide. The 3500 System category can help locate a model family, but a listing is not approval evidence. Availability, condition, delivery, warranty, and documents must be confirmed for the exact offer. Amikon Limited is an independent supplier, not an authorized or affiliated manufacturer channel. OEM warranties do not apply, and firmware is not guaranteed.

What Testing Is Required After Installation?

Testing must prove the required protection, monitoring, and communication functions, not merely that the module reports an OK status. The exact procedure depends on the approved module manual, machine protection philosophy, site safety rules, and change scope. Qualified personnel must create and authorize the test plan before the outage.

Preserve the Baseline and Authorize the Test

Before removal, save the active rack configuration through the controlled site process and preserve alarm, event, communication, and channel baselines. Record live values for each affected channel, including Gap or bias values where applicable, units, setpoints, relay states, 4-20 mA outputs, DCS points, System 1 data, and dynamic waveforms required for comparison.

The method must identify machine state, permit, bypass or inhibit status, trip-risk controls, responsible persons, communication impacts, and a known rollback point. Confirm the replacement and its rear I/O or PIM against the approval record before it reaches the rack. Do not begin work when the recovery unit, configuration, or authorization is missing.

Prove Each Affected Function in a Controlled Sequence

After installation and configuration, verify only under the approved OEM and site procedure:

  1. Confirm the module reports the expected OK status and communicates correctly within the rack.
  2. Compare every affected channel's live value, units, range, Gap voltage, bias, and transducer OK status with the approved baseline and test input.
  3. Exercise Alert and Danger behavior through the site's approved simulation or test method, including delays, latching, reset, inhibit, and bypass behavior.
  4. Verify relay mapping, contact state, voting, cause-and-effect, and shutdown logic without exposing personnel or machinery to an uncontrolled trip.
  5. Check each applicable 4-20 mA output at the receiving DCS, recorder, or control input, including scaling and failure indication.
  6. Verify Modbus, Ethernet, gateway, and other affected communications, including addresses, point mapping, timestamps, and quality status.
  7. Confirm System 1 receives the required static values and, where licensed and configured, the required dynamic waveforms and event data.

The 3500 System datasheet, document 162096 Rev. J, describes configurable alarm setpoints, channel names, communication parameters, relay logic, and signal-processing options. Those are separate acceptance targets. One healthy status indicator cannot demonstrate them all.

Restore Protection or Execute the Rollback

After successful testing, remove temporary bypasses and inhibits through the approved sequence, restore normal key and access states, confirm alarms and communications, archive the final configuration, and obtain signatures from the named owners. Attach results, measured values, exceptions, photos, and final part identities to the change record.

Stop and roll back when a required channel cannot be validated, configuration cannot be restored, communication or dynamic data is missing, a relay or trip result disagrees with the cause-and-effect, an approval condition is not met, or the candidate identity differs from the evaluated unit. The signed record, not elapsed time or LED status, closes the replacement.

Frequently Asked Questions About 3500 Old/New Compatibility

Q1. What Evidence Is Acceptable When the Legacy OEM Manual Is Unavailable?

Use a controlled OEM supersession notice, product update, service bulletin, or project document that identifies both assemblies and the approved change. A seller cross-reference may start the search, but it cannot close compatibility. If no traceable source connects the numbers, record the proposal as an Open Question and do not approve it as a direct replacement.

Q2. How Should a Repaired or Remanufactured Module Be Documented?

Record the serial number, repair provider, repair scope, replaced components, firmware state, test method, measured results, warranty, and any modification to labels or approvals. Compare that record with the approved candidate identity. A functional bench test does not by itself prove compatibility with the installed I/O, rack configuration, or protection duty.

Q3. When Must the Change Be Escalated to MOC or Functional-Safety Review?

Escalate when the candidate changes a safety function, SIL basis, hazardous-area approval, alarm or trip logic, voting, relay output, field wiring, bypass arrangement, communication path, or proof-test method. The site procedure determines the formal route, but procurement should not release the order while the required engineering or safety owner remains unidentified.

Q4. What Must Receiving Inspection Compare with the Approved Record?

Receiving inspection should compare the shipped front and rear part numbers, suffixes, serial numbers, hardware markings, firmware evidence, condition, included accessories, and repair documents with the approved candidate record and quotation. Quarantine the item if any identity differs. Engineering must disposition the variance before the module is issued for installation.

Q5. Can One Qualified Spare Be Used Across Multiple 3500 Racks?

Only after each intended rack has been evaluated separately. Build an approved-use matrix that links the spare’s complete identity to each rack’s rear I/O, hardware and firmware baseline, configuration, field signals, communication dependencies, and certification requirements. A successful installation in one rack does not qualify the same spare for another. Label the spare with its approved rack applications and require engineering review before using it anywhere else.

Approve the Replacement Only with Documented Evidence

The 3500 family often provides continuity across long operating lives, but "newer" never proves a perfect replacement. Approval requires the complete front and rear identities, hardware and firmware revisions, configuration, communications, approvals, and application conditions to agree. For sourcing, send us readable photos of the installed and candidate units, the rack configuration, and the required field function through our contact page. We can quote the approved requirement; your qualified engineers retain compatibility, installation, and commissioning authority.

Keep your system in play!

Select
ABB
Accutrac
Acopian
AC Tech
Action Instruments
Adam
Adaptec
Advanced Micro Controls
AEG
Alcatel
Allen-Bradley
3M
Alstom
AMCI
Apparatebau Hundsbach
Array Electronic
ASTEC
Automation Direct
B&R
Balluff
Banner Engineering
Barco Sedo
Bartec
BECK
Beier
Beijer Electronics
Bently Nevada
Biviator
Black Box
Bosch
Braun
CEAG
Crouzet
Control Techniques
CTI-Control Technology Inc
Cutler-Hammer
Danfoss
DEC - Digital Equipment Corp
Delta Computer Systems
Delta Electronics
Digital
Digitronics
Durag
EATON
EBELT
Eberle
Emerson
Endress Hauser
Entrelec Schiele
Eurotherm
Fanuc
Farnell
Festo
Finder Varitec
Fischer Porter
Forney Engineering
Fuji Electric
General Electric
Grayhill
Harting
Hedin Tex
HEIDENHAIN
Helmholz
HIMA
Hirschmann
Hitachi
Honeywell
IBM
idec
IDS
IFM Electronic
INAT
Intel
Invensys
JAQUET
Jetter AG
Kieback & Peter
Klockner Moeller
Koyo
Kuhnke
Lambda
Landis Gyr
Lauer
L&N - Leeds & Northrup
Lenze
Leukhardt Systems
LG GoldSec
Littlefuse
Lumberg
Magnecraft
Mannesmann
Matsushita
Mean Well
Measurement Systems
Measurex
MEDAR
Micro Innovation AG
Micron Control Transformers
Mitsubishi
Molex
Moog
MTL Insturments Group
MTS
Murr Elektronik
NAIS
NEC
Omega Engineering
Omron
Opto 22
Orbitran Systems
PANALARM
Pepperl + Fuchs
Philips
Phoenix Contact
Pilz
Red Lion
Reliance Electric
Rexroth
RIS - Rochester
Ronan
SAE Elektronik
SAIA
Sauter
Schiele
Schildknecht
Schiller Electric
Schleicher
Schneider Electric
Schrack Technik
Selectron
SEW
Spectrum Controls
Sprecher + Schuh
Square D
Stahl
STI - Scientific Technologies, Inc.
SysMik
Taylor
Tecnint HTE
Telemecanique
Toshiba
Transition Networks
TR Electronic
UniOP
Vibro-Meter
VIPA
Visolux
Wachendorff Advantech
Wago
Weidmuller
Wöhrle
Woodward
Yokogawa
Ziehl-Abegg
Xycom
Epro
bachmann
Saftronics
Siemens
KEB
Opti Mate
Arista
MKS
Motortronics
Metso Auttomation
ProSoft
Nikki Denso
K-TEK
Motorola VME
Force Computers Inc
Berger Lahr
ICS Triplex
Sharp PLC
YASKAWA
SCA Schucker
Bremer
Molex Woodhead
Alfa Laval
Siemens Robicon
Proface
Supcon
Carlo Gavazzi
SST
Hollysys
SOLIDSTATE CONTROLS
ETEK
OPTEK
KUKA
WHEDCO
indramat
Miscellaneous Manufacturers
TEKTRONIX
Rorze
DEIF
SIPOS
SHINKAWA
ANYBUS
HVA
GERMAN POWER
KONTRON
ENTEK
TEL
SYSTEM
KOLLMORGEN
LAZER
PRECISION DIGITAL
LUBRIQUIPINC
NOKIA
SIEI-Gefran
MSA AUER MUT
KEBA
ANRITSU
DALSA
Load Sharer
SICK
Brad
SCHENCK
STAIGER MOHILO
ENTERASYS
USB-LG
TRS
BIOQUELL
SCHMERSAL
CORECO
KEYENCE
BIZERBA
BAUERBAUER
CONTROL
PACIFIC SCIENTIFIC
APPLIED MATERIALS
NMB
NI
Weishaupt
Weinview
CISCO
PARKER
KONECRANES
TURBUL
HMS
HOFFMAN
HUTTINGER
TDK-Lambda
RESOLVER
Knick
ATLAS
BENDER
SABO
BALDOR
Lam Research
NTN BEARING
ETA
WEST INSTRUMENTS
TDK-Lambda
Fireye
DAHUA
TESCH
ACROSSER
FLUKE
Sanyo Denki
Bruel & Kjaer
EPSON
HIOKI
Mettler Toledo
RAYTEK
EPCOS
DFI
SEMIKRON
Huawei
INDUSTRONIC
ASI-HVE
BARTEC POLARIS
AMAT
GD Bologna
Precise Automation
RADISYS
ZEISS 
Reveal Imaging
Saiernico
ASEM
Advantech
ANSALDO
ELpro
MARCONI
EBMPAPST
ROTORK
KONGSBERG
SOCAPEL
TAIYO
SUN
York
KURODA
ADLINK
Notifier
HBM
Infineon
LNIC
Saipwell
JIANGYIN ZHONGHE
W.E.ST. Elektronik
EXPO
DEEP SEA ELECTRONICS
BECKHOFF
Drager
ZENTRO ELEKTRONIK
ATOS
TRSystemtechnik
JDS Uniphase
ADEPT
REO
Panametrics
Xenus
SIGMATEK DIAS
S.C.E Elettronica
EKF
ETEL
STOBER POSIDYN
HANSHIN
DDK
EITZENBERGER
LTI MOTION
XP Power
Panasonic
Matrox
SBS Technologies
WARTSILA
MURPHY
MADOKA
Arcnet Danpex
Littelfuse
TACAN
Hurco
SAMGONG
ALPHA
Luxco
Nautibus
PAWO Systems
Haver&boecker
VAISALA
Consilium
SERIPLEX
MTU
ALPHI
OPTIMATION INC
NTRON
TMEIC GLOBAL
BAUMER
SANYO-DENKI
Seica
ISE Reiter
Seal
ICP ELECTRONICS
Axiomtek
Bautz
Sonosys
Vacon
Nematron
Watt Drive
Sieb & Meyer
Danaher Motion
DEMAG
Digifas
Divus
Bühler
RMV ELECTRONICS
Ono Sokki
Orbotech
PLATING ELECTRONIC
NORD NORDAC
Circuit Line
Berges
AIENSN
SZM
CHATILLON
ACS GROUP
ADVANTEST
Sekidenko
DOLD
TURCK
API Controls
ASAHI KEIKI
QUALIFLOW
ASML
ASTRO
COGNEX
Contec
ESTIC
Fishman
IAI
TeleFrank
Internix
AUMA
PROVIBTECH
K-TRON
Lemforder
IXYS
ALERTON
MOXA
SCIYON
BASLER ELECTRIC
IntraAction
VAT
Delta tau
EMG
HENGSTLER
WESTERMO
Deutsmann Automation
CUMMINS
Bihl+Wiedemann
DAIKIN
Joppich
POUNDFUL
LEINE LINDE
DELIXI
Compressor Controls Corporation
JENAER ANTRIEBSTECHNIK
MCGS
SMC
Load Cell Central
KFG LEVEL
Peripheral Control Systems Corporation
SanDisk
CHINT
Selinc
Eltek
AI‑Tek
HACH
POWER ONE
SIMTRONICS
SiliconDrive
Megger
CATERPILLAR CAT
KYLAND
DUNGS
Horner APG
EBG
LEM
AEREVB
APROTB
ATATVA
BROWN
Adlee
AGEIDA
AVG Automation
Santak
Azbil
Weintek
Get Parts Quote
Comments

Leave Your Comment

Company
* Email
* Mobile
* Content
Your email address will not be published
Newsroom

Related articles Browse All

  • Implementing Vision Systems for Industrial Robots: Enhancing Precision and Automation
    Blog
    2025-08-12 11:26:54
    Implementing Vision Systems for Industrial Robots: Enhancing Precision and Automation
    Industrial robots gain powerful new abilities through vision systems. These systems give robots the sense of sight, so they can understand and react to what is around them. So, robots can perform complex tasks with greater accuracy and flexibility. Automation in manufacturing reaches a new level of ...
  • Optimizing PM Schedules Data-Driven  Approaches to Preventative Maintenance
    Blog
    2025-08-21 18:08:33
    Optimizing PM Schedules Data-Driven Approaches to Preventative Maintenance
    Moving away from fixed maintenance schedules is a significant operational shift. Companies now use data to guide their maintenance efforts. This change leads to greater efficiency and equipment reliability. The goal is to perform the right task at the right time, based on real information, not just ...
  • The Evolution of Steam Turbine Control Systems
    Blog
    2026-03-31 08:33:35
    The Evolution of Steam Turbine Control Systems
    CALL US:+86-18020776786 | E-MAIL:INFO@AMIKON.CN In-depth analysis of the GE Mark VIe control system Mark VIe: A Modern Mainstay for Industry 4.0 Mark VIe's core concepts are "high availability, open connectivity, and intelligent readiness." It utilizes comm...